GridTorrent

From Java CoG Kit

Jump to: navigation, search

This page is used to coordinate the tasks related to the thesis work and publications related to it.


Contents

To Do

Administrative

[ ] visit the Kaplan page and put a a short bio in journal style in it. click on this link -> (Kaplan)
[ ] fill out this page with more things you can think about (Kaplan)
[ ] put the exact link to the code repository on this page grid-torrent at code.google.com (Kaplan)
[ ] maintain literature in svn in the bib dir under gridtorent.bib do NOT DUPLICATE entries (Kaplan)

Contact

Ali Kaplan

Ph.D. Candidate
Computer Science Department
Indiana University
phone: 812-856-0751

Here is a blog link of my research:

http://alikaplanprgrpt.blogspot.com/

Tasks and Timeline

  • Start Date : 8 January 2007
  • Weekly updates on Fridays

18th - 24th August 2007

Tasks will be achieved.

[ ] Finish the draft of paper.
[ ] Finish off the final architecture of GridTorrent Framework
[ ] Continue on security part
[ ] Put together the previous works
[ ] Arrange the housing issues at RIT


13th - 17th August 2007

Tasks will be achieved.

[x] Complete the report about WAN Distributed file system
[ ] Finish off the final architecture of GridTorrent Framework (not finished due to travel)
[x] Continue on security part
[ ] Put together the previous works (not finished due to travel)
[x] Travel to Rochester
[ ] Arrange the housing issues at RIT
[x] Starting from this week, this page will be updated on Fridays

6th - 12th August 2007

Tasks will be achieved.

[x] Prepare a report about THREDDS and GridTorrent.
[x] Investigate WAN Distributed file system. (started but not finished!)
[x] Continue on security part
[ ] Put together the previous works.
[x] Arrange the housing issues at RIT. (will be arranged next week)

30th July- 5th August 2007

Tasks will be achieved.

[x] Investigate THREDDS.
[x] Study security and cogkit.

8th - 14th March 2007

Tasks will be achieved.

[ ] Prepare a roadmap and timeline for the rest of the research and study (Kaplan)
[x] Update proposal slides and send it to Gregor. (Kaplan)
[x] Arrange a proposal date. (Kaplan)
[x] Analyzing and publishing report about case study testing.

21st - 27th February 2007

Tasks will be achieved.

[x] Code Google account has been created instead of sourgeforge.net account. [1] (Kaplan)
[x] Upload the literature survey document -draft copy- into code.google (Kaplan)
[x] Suggestions for this wikipage has been done. (Kaplan)
[x] Get Deans' signature for the ANL application form. Hopefully, it'll be done tomorrow -02/22/2007. (Kaplan)

7th - 13th February 2007

Tasks will be achieved.

[x] Finishing tasks not completed last week (Kaplan)
[x] Please reorder weekly report in revers time order. E.g. newest one first (Kaplan)
[x] Please indicate with a check mark which tasks have been done. Example in the next line (Kaplan)
[x] This is a task that has been completed (Kaplan)
[x] Please add all tasks with your login name (Kaplan)
[ ] Go to this page and spell check and make look professional (Kaplan)

31th January-6th February 2007

Tasks will be achieved.

[x] Finishing literature survey report. (Kaplan)
[ ] Analyzing and publishing report about case study testing. (Kaplan)
[x] Getting feedback for the survey report. (Kaplan)

24th-30th January 2007

Tasks will be achieved.

[x] Continue the same tasks of last week. (Kaplan)
[x] Study of Java NIO to investigate how it affects Grid Torrent performance. (Kaplan)

15th-22th January 2007

Tasks will be achieved.

[x] Write a draft about literature survey. (Kaplan)
[x] Set case study testing environment (Kaplan)

8th-14th January 2007

Tasks will be achieved.

[x] Finish the list of papers for the survey. (Kaplan)
[x] Complete the tasks related to svn and its client (Kaplan)
[x] Apply for 593 (Kaplan)

Survey

Writing a survey report regarding to p2p, Bittorrent and Grid.

[ ] available p2p applications' list. Their weakness, strength and analyses. (Kaplan)
[ ] p2p usage in Grid applications (Kaplan)
[ ] bittorrent's advantage in Grid application (Kaplan)

Case Studies

[ ] show a case that grid torrent has better performance than parallel tcp. Do that before my proposal!!!!! (Kaplan)

Literature

[x] The bibliogaprhy of my research literature survey can be downloaded from here in Endnote format (Kaplan)
[x] send endnote file to gregor when done -uploaded to Project home on Google code. (Kaplan)
[ ] make sure gregor checks it into the svn (Kaplan)
[ ] add a task to the timeline when this is planed to be completed (Kaplan)

Questions to be answered

  1. will you use word or latex for thesis? I suggest latex but dont mind word if you use simple word.
  2. all images in ppt no word images
  3. references must be in bibtex as this avoids many of the pitfalls with incomplete references and you can use 100ndds of references from the cog group through our svn

Proposal

Thesis Proposal: .... presentation ...


[ ] thesis proposal (Kaplan)
[ ] presentations (Kaplan)
[ ] what is the thesis format for indiana (Kaplan)
[ ] what are the timelines for anticipated completion and graduation (Kaplan)
[ ] any paperwork to be filed for Gregor to be in the committee (Kaplan)

Personal tools
Collaboration and Jobs